Track Roadbed Clearing, Grading, Subgrade & Sub-ballast, and Drainage.

Southern National track drainage

Southern National Track railroad construction company has the experience to perform all types of track roadbed preparation and railroad surfacing in advance of your track project!  Our new Mark IV Tampers provide the very latest in track resurfacing technology:

  • Ability to create any type of high-speed main line or industrial track vertical and horizontal geometry with extreme accuracy
  • Long distance laser allows lining nearly one mile at a segment– to perfectly straight string line geometry
  • The newly developed ‘surface lift’ software provides an overall vertical surface profile superior to any other tamping system in the world.
  • Production capacity of over two track miles per day

I want you to know that Marnie and his crew did an excellent job at the Intercession City site. They worked safely, and as a team. They were very efficient and the CSX inspector raved about their work, stating that he wished all his contractors did as good a job.

Gene Morrow
Duke Energy Plant Manager,
Intercession City site

Southern National Track constructed a new 3.5 mile industrial park rail line in a hilly area of Haines City FL that required thousands of yards of cut and fill work before the sub-ballast application.

Southern National Track can cut in or install track drainage systems per your specs.

Southern National Track is proud to be a distributor the new railroad drainage technology, HydroBlox

Southern National Track knows railroad track construction.